Richard in LA
Mag Whore
I'm looking to build a 30x40 Mueller metal building in the next couple months, and I remember there was a member or 2 who did concrete work. I'll be assembling the building myself (along with a couple friends), and looking for recommendations of people in Ascension parish to do the concrete. If calculations are correct, should be in the range of 22-24 yards of concrete, with the crazy footers that are required per building Asc parish permits. Anyone recently build a shop or have a slab poured by someone that they would recommend me contacting for a quote?