this is gonna turn into the "oilfield hands" thread
What do you do and who do you work for?
this is gonna turn into the "oilfield hands" thread
this is gonna turn into the "oilfield hands" thread
i'm no drilling engineer but i believe whats happens is when they get enough mud or kill fluid back down the pipe with weight of the mud in the pipe will hold the oil & gas down in the formation. cement is pumped in on top of the mud to seal the well off. someone with some well control exp may chime in and give a better explanation